Cimel Base | Cimel Industrial HQ - Malembo, Cabinda - Angola, 2017

O lote está localizado na zona industrial de Malembo, um local bem infraestruturado a Norte de Cabinda.

A intervenção surge para criar a base industrial de uma empresa de lavagem, reparação e manutenção de peças e maquinarias, providenciando estes serviços para as várias industrias existentes em Cabinda.

Trata-se de um complexo industrial auto-suficiente, com a instalação de geradores de fornecimento de eletricidade, reservatórios para abastecimento de água de lavagem e água tratada, bem como tratamento de resíduos industriais com ETAR, separadores de lama e separadores de hidrocarbonetos.

O Edifício principal configura-se numa nave aberta de 60,00m de comprimento x 20,00m de largura, com duas pontes rolantes e 12 estações de trabalho, cada estação disponibilizando abastecimento e drenagem de água, tomadas monofásicas e tomadas trifásicas.

Com ligação ao edifício principal, são também construídos espaços de escritórios, refeitório e balneários para a equipa de produção e para os seguranças do complexo.

Nos arranjos exteriores foram criadas várias zonas verdes com árvores autóctones, para auxiliar a contenção de terras e facilitar a drenagem de águas pluviais pela via da infiltração natural.

 

The lot is located in the industrial zone of Malembo, a place well infrastructured in to North of Cabinda.

The intervention aims to create the industrial base of a company of washing, repair and maintenance of parts and machinery, providing these services to the various industries existing in Cabinda.

It is a self-sufficient industrial complex, with the installation of electricity supply generators, water well and reservoirs for the supply of washing water and treated water, as well as treatment of industrial waste with WWTP, mud separators and hydrocarbon separators.

The main building consists of an open nave of 60.00 m long x 20.00 m wide, with two overhead cranes and 12 workstations, each station providing water supply and drainage, single-phase sockets and three-phase sockets.

Connected to the main building, office space, refectory and changing rooms are also built for the production team and the security guards of the complex.

In the exterior arrangements, several green zones were created with native trees, to help with the containment of lands and to facilitate the drainage of rainwater via natural infiltration.

 

 

Cliente | Client: Cimel

Arquitecto | Architect: Pedro Resende

Equipa | Team: Luís Machado

Engenharia | Engineering: DCRS

Construção | Construction: Designometal